Skip to content
AYARUX

How do you write a print quote? From the job's cost to the quote the customer sees

A print quote is much more than a single figure given over the phone. A quote with the paper miscounted, the waste forgotten or no terms written on it comes back as a loss or an argument once the job is done. This guide walks through how a print quote is built, from the job's cost to the quote the customer receives.

Last updated:

Start with the job: what does the quote cover?

Before pricing, pin the job down: quantity, finished size, page count, paper type and weight, colours (4/4, 4/0 and so on), binding or finishing, and delivery date. If any of these changes, so does the price.

Writing the job specification at the top of the quote records exactly what the customer approved. Most later “but we said 350 gsm” conversations are prevented right there.

The cost lines

The cost of an offset job is made up of a few lines, each worked out on its own and then added up:

  • Paper: sheets × sheet weight; paper is bought by the kilo, so the weight comes from the grammage and the size.
  • Plates: one per colour per signature; plates are priced by the piece.
  • Printing: the number of impressions from the sheet count and the number of sides.
  • Make-ready: setting up, getting the colour right and the first sheets of every job.
  • Finishing, if any: cutting, folding, binding, lamination, varnish.

Do not forget the waste

Some paper is always lost to make-ready, colour matching and finishing. The sheet count in a quote should include waste, not just the net need; otherwise the paper line comes up short on every job.

Waste varies with the job, the press and the finishing; use the real figures from your own shop.

The sheet you choose changes the price

The same job yields a different number of pieces on different sheet sizes. The sheet that fits the most pieces is not always the cheapest; what matters is the paper used per piece. Comparing the sizes the press can take before quoting can lower the unit price directly.

On signature work, the number of signatures and the choice of work-and-turn or sheetwise change the plate count, which is a large line in the quote.

Margin, VAT and terms

The margin goes on top of the cost, then the VAT. State clearly on the quote whether VAT is included or not.

Put the terms under the price: how long the quote is valid, payment terms, what happens if the paper price changes, the quantity tolerance and the artwork requirements. These lines are short but they prevent most disputes.